WEEE Regulations

Need information?

Quick request

    Moduli fotovoltaici dismessi e materiali separati in un impianto di trattamento

    Photovoltaic panel disposal: GSE requirements and WEEE rules

    The disposal of photovoltaic panels is governed by specific environmental regulations, including Italian Legislative Decree 49/2014, which transposes the European WEEE Directive (Waste Electrical and Electronic Equipment).

    Decommissioned panels must be treated by authorised operators, in plants specialised in recovering materials such as glass, silicon, aluminium, plastic and copper.

    Without the WEEE certificate and the FIR, the GSE does not refund the deposit paid.

    Why panels are WEEE

    Photovoltaic modules are classed as electrical and electronic equipment: at the end of their life they cannot be disposed of as general waste or handled by unauthorised operators.

    The GSE deposit

    Those who received incentives from the GSE (Italy's energy services operator) under the Conto Energia feed-in scheme must pay a mandatory deposit of around €20 per module at the start of the contract. This amount is refunded only if the final disposal is properly documented.

    The documents required by the GSE

    • WEEE certificate confirming treatment at an authorised plant.
    • FIR (Waste Identification Form) with all the transport and destination details.

    Without these documents the GSE does not refund the deposit. It is therefore essential to rely on an authorised company, able to manage the whole process in compliance with the law and provide all the required documentation.

    How we work

    Barbieri Ecologia operates under a single authorisation pursuant to art. 208 of Italian Legislative Decree 152/2006 and issues the FIR and the WEEE certificate to the customer once treatment is complete.

    Find out how the GSE refund works or about our panel recovery service.

    Vetro e rame separati dai moduli fotovoltaici

    Why choose us

    An authorised plant and complete documentation for the GSE.
    Authorised plant
    Single authorisation under art. 208 and registration with the CdC RAEE.
    Complete documentation
    FIR and WEEE certificate once treatment is complete.
    Yes. Italian Legislative Decree 49/2014 includes them among waste electrical and electronic equipment: they must be treated by authorised operators, in specialised plants.
    For systems incentivised under the Conto Energia scheme, the deposit is around €20 per module.
    The WEEE certificate from the treatment plant and the Waste Identification Form (FIR).
    Yes: once treatment is complete we issue the FIR and the WEEE certificate.